Pick the constraint that is hardest to change. A crane that cannot reach the pad eliminates a finished volumetric box. A 30 m clear span eliminates a stack of 6 m modules. A sleeping use eliminates a bare site-office fire note. The selector below is a conversation map, not an automated stamp.

  • Use and overnight occupancy
  • Wind, snow, seismic basis
  • Module size versus clear span
  • Weeks until occupancy

Three constraints that change a shortlist

Consider a sixteen-room school swing campus with a covered corridor. Comparing panel U-values is useful, but the corridor link also affects the thermal bridge and the accessible route. Ask suppliers to mark the envelope boundary and the link on the same plan so both bids include the same transition.

If the hardest constraint is the road, pack a frame. If the hardest constraint is the week people walk in, finish the room in the bay and prove the crane.

A remote camp with a narrow road and a fixed occupancy date illustrates the trade. A bolted frame may fit the truck envelope while adding assembly days. Ask the bidder to break out packaging, field joints and weather protection so the purchase team can compare the installed cost.

A 36 m workshop with an overhead crane runway raises a different question. Have the project engineer review the runway loads, clear span and portal frame before requesting a quote for the shell. Modular offices may still work as attached rooms once the building interface is detailed.

System comparison used in the selector. Figures are typical discussion ranges, not a rated product line.
Question Volumetric module Bolted flat-pack Light-gauge panels Portal-frame PEB
Factory completion Room, often MEP to an interface box Frame and pack, more site close-up Panels and trusses, site assembly Fabricated members, site erection
Transport One box per trailer in many cases Higher count per 40HQ Dense packs of studs and panels Long members, escort rules may apply
Span Tied to module width Tied to the bolted bay House-scale spans Clear span often 18–60 m
Envelope talk 50–100 mm sandwich panel Same panel choices after the frame Stud cavity plus sheathing or panel Purlin, girt and cladding build-up
Code posture RB or PMC, local file still required Same, plus site joint quality Often closer to a permanent house file Industrial building file, crane loads extra

Limits to read before you fall in love with a photo

A relocatable building can move and can be leased. Occupancy still needs the fire, energy, accessibility and structural review of the place it sits. Permanent modular construction accepts a heavier approval file and a longer life on one foundation. If someone offers a module that “does not need a permit anywhere,” treat that sentence as a reason to stop, not as a feature.

Ask for the test environment (the assembly, including joints and a representative opening), the method named by the reviewer, the duration in minutes, and whether doors were in the specimen. A 60 minute figure on a core sheet, with no joint, is not a result you can hand to a fire consultant. Boxx Modular can line up a sample panel and a drawing review with the project engineer. That review is a check of documents. It is not a certificate with your address on it.

Z275 galvanizing on cold-formed steel (CFS) is a mass, not a decade count in salt air. Cut edges and welds need a repair spec. A painted carbon-steel portal frame can take an intumescent coating where the fire strategy calls for it, and that coating has a thickness and an inspection cycle. If the file is silent on repairs, the selector is not finished.

Many modules borrow a shipping envelope. That does not mean the unit carries an ISO CSC plate or can be stacked in a container terminal. Flat-pack container houses, expandable boxes and volumetric offices are specified as buildings. Ask for the lifting diagram you will actually use, not a shipping-container slogan.

Walk a real brief through the selector

Send use, country, quantity, span and the week you need occupancy. The reply will name a system, or it will name the datum that is still missing.

  • Four systems compared on completion, transport, span, envelope and code posture
  • Fire, coating and permit limits stated in the same pass
  • Sample review offered as a document check, not a stamp
  • Workshop spans redirected out of the module family